Sanitary Engineering Sector Performance

Sanitary Engineering Operation and Maintenance Directorate

Performance 2019

  • The TEQCG laboratories have introduce new testing parameters for the first time in attempt to fulfil the Bahraini Standard for wastewater, Law 33 for 2006

  • According to Ministry of Works, Municipalities and Urban Planning Policy in upgrading the laboratory performance Treated Effluent Quality Control Group has purchased some advanced analytical instrument that enhance the produce ability, accuracy and efficiency of the laboratories as listed below:

    a. Spectrophotometer DR6000.
    b. Autotitrator.

  • The Directorate has maintained a production rate of more than 95 thousand cubic meters of treated wastewater per day, which is treated with the latest technologies at Tubli wastewater treatment center, which is then transferred by distribution networks to farmers in different regions of the Kingdom.

0

Total Complaints recorded and related to the sewage network assets

All Complaints were handled within one hour only after received from the Control and Reporting Center in the Sanitary Engineering sector

0

Total reports regarding the breakdown of pumping stations

All reports were dealt with through the implementation of operational contracts and periodic maintenance

  • All transmission and distribution networks for treated wastewater were maintained including all inspection chambers according to the planned maintenance program prepared.

  • TWPCC received more than 85 million cubic meters of wastewaters until the beginning of October. Most of the incoming flow received were fully preliminary and secondary treated while a small portion were partially treated.

  • The planned preventive and corrective maintenance required for mechanical, electrical and measuring equipment were carried out in all major and minor treatment plants. Moreover, the overhauling works for the sludge dewatering and drying plant at Tubli Wastewater Treatment Center are being carried out according to the work plan.

0

Total storm water gullies were cleaned

0

million cubic meters

Amount of the sanitary influent which was treated by Tertiary Treatment

0

Bahraini Dinars

TOTAL COST SANITARY SECTOR PROJECTS

Complaints Registered in Sanitary Sector

  • Registered Complaints
  • Processed Complaints

Sanitary Pumping Station Breakdowns

  • Registered Breakdowns
  • Processed Breakdowns

Sanitary Engineering Planning & Projects Directorate

Performance 2019

Upgrading of South Alba Sewage Treatment Plant

Project’s Scope of Work:

The project involves the upgrading of the existing, overloaded and poorly performing STP and includes:

– Increase in treatment capacity from 900m3/day to 2,500m3/day (with provision for expansion to 4,000m3/day)

– Effluent suitable for unrestricted reuse and disposal to the marine environment

– New sea outfall for excess effluent disposal

CONTRACT VALUE(BD) START DATE END DATE
5,397,980.000 17 January 2016 28 February 2019

Drainage Outfall Diversion at Seef-Reef Area

Project’s Scope of Work:

The work comprises diversion of 170 meters of 1000 dia. twin pipes drainage. And construction of outfall & headwall structure near Seef-Reef Island Bridge.

CONTRACT VALUE(BD) START DATE END DATE
159,417.000 11th November 2018 10th May 2019

PArad 241 Sewerage Scheme and Replacement of Mains on Roads 4501 & 4502

Project’s Scope of Work:

The Project involves the construction of a sewer network system comprising of 827 m of NDRC work with 15 no. Deep Gravity Chamber, 3km Main lines, 2km Laterals, 263 no. Manholes & Chambers and 150 House Connections to serve the residents of Arad, Block 241.

CONTRACT VALUE(BD) START DATE END DATE
2,025,559.400 12 March 2017 27 May 2019

Diversion of Drainage & Extension of Sewer – Manama 348

Project’s Scope of Work:

The Project involves laying 265 meters of sewer network, 88 meters by NDRC method to cross King Faisal Highway and construction of 1 Lifting Station.

CONTRACT VALUE(BD) START DATE END DATE
319,950.000 25th March 2018 8th July 2019

Proposed Holding Tanks For Pump Station E4, Hamad Town Block 1216

Project’s Scope of Work:

The work comprises of constructing (19X5.8X6.25 Deep) of 2 Numbers of Holding Tanks for pump station E4, in Hamad Town block 1216, including associated works of 106 meter sewer line 250 Dia, and 3 Manholes.

CONTRACT VALUE(BD) START DATE END DATE
157,317.000 5th May 2019 4th August 2019

Rehabilitation / Upgrading of Minor Sewerage Pumping Stations

Project’s Scope of Work:

A number of foul sewerage pumping and lifting stations (37) have been selected for rehabilitation and upgrading of their electro-mechanical equipment. Under this project the selected stations will be equipped with new pumps, internal piping, valves, fittings, electrical control panels, control system and instrumentation/ sensors. For several stations some minor civil works such as, fixing of damaged GRP liners, new cable sleeve piping, refurbishment of covers, bollards, and new concrete plinths for the new electrical control panels has been included as well.

CONTRACT VALUE(BD) START DATE END DATE
1,031,528.809 15 October 2015 13 October 2019